Roof Inspection Checklist (Commercial + Residential)
Roofs fail in patterns. Flashings, penetrations, drains, and parapets are where 90% of leaks originate — almost never the field membrane itself. This checklist covers those failure points plus the routine items that drive maintenance scheduling. Use it for new install QA, annual inspections, and post-storm damage assessments.
References: NRCA Roofing Manual, IBC Ch. 15, ASTM D3019 (single-ply membranes)
015 items
Drainage
- 01Roof slopes ≥1/4 in per ft minimum (no ponding water)
IBC 1502.2
- 02Roof drains free of debris, dome strainers in place
- 03Scuppers and overflow drains clear, sized per code
- 04Gutters secured, no sags, downspouts terminate clear of foundation
- 05No standing water 48 hr after rain (ponding = failure)
024 items
Field Membrane
- 06Membrane intact, no punctures, blisters, or wrinkles >1 in
- 07Lap seams welded/glued continuously, no fish-mouths
- 08No tears at corners, transitions, or curb intersections
- 09Surface granules intact (asphalt) or no chalking (single-ply)
035 items
Flashings
- 10Wall flashings extend min 8 in up wall, fully adhered/mechanically fastened
- 11Counter-flashing reglet sealed, no gaps
- 12Coping caps secure, joints sealed, slope to drain side
- 13Pipe boots intact, no UV cracking, sealed at top
- 14HVAC curb flashings plumb, sealed at all 4 corners
044 items
Penetrations & Equipment
- 15Every penetration has flashing + sealant — photo each one
- 16Equipment supports protect membrane (no metal-to-membrane contact)
- 17Conduit and pipe runs supported, not lying on membrane
- 18Walking pads at high-traffic equipment areas
052 items
Parapets & Edges
- 19Parapet caps level, joints staggered + sealed
- 20Edge metal hemmed or capped, no sharp edges
OnsiteAudit for iPhone
Run this on your phone.
Run this checklist on every site, capture defect photos as you go and build the report on site, with the AI running on the iPhone itself.
More for OnsiteAudit users
- 24 items
Concrete Pour Pre-Pour Inspection Checklist
Verify everything BEFORE the truck arrives.
- 22 items
Electrical Rough-In Inspection Checklist
Catch every NEC violation before drywall closes the wall.
- 38 items
Residential Construction Punchlist Template
Every item that delays a closing — caught at substantial completion.
- 22 items
Final Walkthrough Checklist (Substantial Completion)
The walkthrough that converts to occupancy without callbacks.
- 18 items
Drywall Inspection Checklist
Every drywall failure caught BEFORE finish + paint hides it.
- 19 items
Foundation Inspection Checklist
Verify the parts that get buried — before they get buried.
- 22 items
HVAC Commissioning Checklist
The system delivers what the design said it would.
- 20 items
Plumbing Rough-In Inspection Checklist
Verify before drywall — every penetration, every slope, every test.
- 18 items
Pre-Drywall Walkthrough Template (Customer-Facing)
The walkthrough that catches "wait, where's my outlet?" before insulation closes the wall.