Pre-Drywall Walkthrough Template (Customer-Facing)

For: GCs, sales reps, homeowners, customer service managers

The pre-drywall walkthrough is the last chance for the homeowner to catch missing outlets, wrong rough-in heights, missing low-voltage, and mis-framed openings. After drywall, every change is a change order. This template walks the homeowner through every room with the questions they don't know to ask.

References: NAHB Customer Service Standards · Local plan-review requirements

Want to do this on your phone — offline, with photos per item, exported as a PDF in 90 seconds?

Use OnsiteAudit — runs offline, captures photo evidence per item, exports a sharable PDF.

Get OnsiteAudit

Living Spaces

  • Outlets at desk locations (verify position with homeowner)

  • Switches at correct entry points to each room

  • TV cable + Ethernet rough-in at planned TV locations

  • Speaker pre-wire if discussed at design phase

  • Window rough openings match selected window dimensions

  • Floor outlets if required for furniture layout (mark on drawings)

Kitchen

  • Outlet placement in backsplash zone — sized for appliance loads

  • Refrigerator water line rough-in at correct location

  • Microwave outlet at upper-cabinet height (if microwave goes there)

  • Range/oven gas or 240V circuit at correct position

  • Disposal switch reachable from sink, separate from light switch

  • Pendant light boxes located per island/peninsula plan

Bathrooms

  • Vanity light box centered above mirror per finish drawings

  • Outlets above counter (NOT inside cabinets — verify height)

  • Exhaust fan rough-in (vented to exterior, NOT to attic)

  • Plumbing rough-in matches selected vanity/toilet centerlines

Garage / Mechanical

  • EV charger circuit roughed in at vehicle location (even if unit not installed)

  • Workshop outlets at planned bench locations

  • HVAC return air location accessible (not behind future shelving)

Sign-Off

  • Homeowner walks every room with builder superintendent

  • Photos taken of every wall with rough-in, attached to file

  • Any change requests documented + change-order issued before drywall

  • Both parties sign acknowledgment that walkthrough completed