Residential Construction Punchlist Template
A residential punchlist is the make-or-break document between "substantial completion" and "owner takes possession." This template covers the items that typically appear: exterior envelope, interior finishes, MEP, appliances, and the small stuff that delays signing. Use it during your final walkthrough and during the 30/60/90-day post-occupancy check-ins.
References: AIA G704, NAHB Quality Standards, Local building codes
017 items
Exterior
- 01Siding/cladding flush, no gaps, fasteners flush
- 02Caulk continuous at penetrations, windows, doors, transitions
- 03Paint coverage uniform, no holidays, edges cut clean
- 04Gutters and downspouts secured, sloped, drain away from foundation
- 05Grading slopes ≥6 in over 10 ft away from foundation
- 06Driveway and walks no cracks >1/4 in or settlement
- 07Fence/gates plumb, latch and lock function
028 items
Interior — Finishes
- 08Walls free of dings, drywall seams flat, no popped nails/screws
- 09Paint touch-up consistent with primary color, no flashing
- 10Trim and base mitred tight, no gaps at corners or floor
- 11Floors level — no squeaks, no gaps at thresholds
- 12Tile grout consistent, no cracks, sealed at wet locations
- 13Cabinet doors aligned, soft-close functional, drawers operate
- 14Countertops sealed, no chips at sinks/cooktops, brackets hidden
- 15Closet shelving level, supports adequate for load
034 items
Doors & Windows
- 16All doors swing freely, latch without forcing, no rubbing
- 17Door hardware tight, lock cylinders work, keys provided
- 18Window operation smooth, locks engage, screens fit
- 19Weatherstripping continuous at all exterior openings
0412 items
MEP & Appliances
- 20Every electrical outlet works (test with circuit tester)
- 21GFCI test buttons trip and reset on every protected receptacle
- 22Light switches operate intended fixtures (label any wrong-switch)
- 23HVAC delivers heating AND cooling at every register
- 24Thermostat reads accurately, scheduling functional
- 25Hot water at every fixture within 30 sec, temp ≤120°F at fixture
IRC P2723
- 26Faucets no drip, no slow-drain, hot/cold reversed nowhere
- 27Toilets flush, refill, no run-on, no leaks at base/supply
- 28Smoke detectors test (each one), CO detectors test, batteries fresh
- 29Range hood vents to exterior, fan operates
- 30Dishwasher and washer hoses no leaks, drains free
- 31Refrigerator ice maker connected, water line no leak
056 items
Documentation Handoff
- 32All warranties (HVAC, appliances, roofing, windows) collected and dated
- 33Operating manuals organized in one binder
- 34Subcontractor contact list with phone + email
- 35Final occupancy permit posted/filed
- 36As-built drawings + electrical panel schedule provided
- 37Paint color codes, flooring SKUs, tile lot numbers documented
OnsiteAudit for iPhone
Run this on your phone.
Run this checklist on every site, capture defect photos as you go and build the report on site, with the AI running on the iPhone itself.
More for OnsiteAudit users
- 24 items
Concrete Pour Pre-Pour Inspection Checklist
Verify everything BEFORE the truck arrives.
- 22 items
Electrical Rough-In Inspection Checklist
Catch every NEC violation before drywall closes the wall.
- 22 items
Final Walkthrough Checklist (Substantial Completion)
The walkthrough that converts to occupancy without callbacks.
- 18 items
Drywall Inspection Checklist
Every drywall failure caught BEFORE finish + paint hides it.
- 20 items
Roof Inspection Checklist (Commercial + Residential)
Catch the leak point BEFORE the next storm proves it.
- 19 items
Foundation Inspection Checklist
Verify the parts that get buried — before they get buried.
- 22 items
HVAC Commissioning Checklist
The system delivers what the design said it would.
- 20 items
Plumbing Rough-In Inspection Checklist
Verify before drywall — every penetration, every slope, every test.
- 18 items
Pre-Drywall Walkthrough Template (Customer-Facing)
The walkthrough that catches "wait, where's my outlet?" before insulation closes the wall.