Concrete Pour Pre-Pour Inspection Checklist
Concrete is the trade with the lowest tolerance for rework. Once it sets, mistakes become demolition. This pre-pour inspection covers the items that can still be fixed with a truck on the way and the ones that absolutely must be verified before the chute drops.
References: ACI 301-20, ACI 318-19 §26, ASTM C31/C31M, ASTM C143/C143M
014 items
Documentation & Submittals
- 01Approved mix design on-site, matches structural drawings
ACI 301 §1.6.1
- 02Concrete delivery ticket reviewed before unloading
- 03Inspector qualifications + ICC/ACI certifications verified
- 04Reinforcing steel mill certs available for spot-check
026 items
Formwork
- 05Forms plumb and level — laser/plumb-bob check at 4 corners
Tolerances per ACI 117
- 06Form ties properly spaced, no over-stress signs at corners
- 07Forms cleaned of debris, snow, ice, standing water
- 08Bond breaker / form release applied if reusing forms
- 09Bracing adequate for hydrostatic head — calc on file for >4 ft pours
- 10Embeds (anchor bolts, sleeves, electrical PVC) at correct elevation + offset
037 items
Reinforcing Steel
- 11Bar size, spacing, count match drawings — RFI on any deviation
ACI 318 §25
- 12Cover verified at top, bottom, sides per exposure class
- 13Lap splices meet length requirement (no shortcuts)
ACI 318 §25.5
- 14Hooks and bends at corners present and oriented correctly
- 15Wire ties or plastic ties at intersections — no missing ties at edges
- 16Rebar free of mill scale flakes, oil, paint that breaks bond
- 17Chairs/bolsters in place — no rebar touching forms or grade
044 items
Weather & Site Conditions
- 18Air temp ≥40°F (cold weather provisions if not, ACI 306)
- 19Air temp ≤90°F (hot weather provisions if not, ACI 305)
- 20No rain forecast within 4 hours of finishing
- 21Wind speed acceptable (high winds = surface dehydration risk)
054 items
Test Specimens & Pre-Pour Sign-off
- 22Slump test cones + tamping rod + scale on-site, calibrated
ASTM C143
- 23Cylinder molds (4×8 or 6×12) on-site, marked, capped, ready
ASTM C31
- 24Air content meter + calibration check
- 25Inspector pre-pour sign-off captured (photo + name + time)
OnsiteAudit for iPhone
Run this on your phone.
Run this checklist on every site, capture defect photos as you go and build the report on site, with the AI running on the iPhone itself.
More for OnsiteAudit users
- 22 items
Electrical Rough-In Inspection Checklist
Catch every NEC violation before drywall closes the wall.
- 38 items
Residential Construction Punchlist Template
Every item that delays a closing — caught at substantial completion.
- 22 items
Final Walkthrough Checklist (Substantial Completion)
The walkthrough that converts to occupancy without callbacks.
- 18 items
Drywall Inspection Checklist
Every drywall failure caught BEFORE finish + paint hides it.
- 20 items
Roof Inspection Checklist (Commercial + Residential)
Catch the leak point BEFORE the next storm proves it.
- 19 items
Foundation Inspection Checklist
Verify the parts that get buried — before they get buried.
- 22 items
HVAC Commissioning Checklist
The system delivers what the design said it would.
- 20 items
Plumbing Rough-In Inspection Checklist
Verify before drywall — every penetration, every slope, every test.
- 18 items
Pre-Drywall Walkthrough Template (Customer-Facing)
The walkthrough that catches "wait, where's my outlet?" before insulation closes the wall.